Vehicles & fleet
Electric passenger, light-commercial, two- and three-wheeler vehicles sourced with the market paperwork, charging hardware and service parts that belong with the fleet.
E-Mobility
Electric mobility is not a vehicle purchase in isolation. The fleet, charging load, site power, spares and service model have to work as one system.
01
Electric passenger, light-commercial, two- and three-wheeler vehicles sourced with the market paperwork, charging hardware and service parts that belong with the fleet.
AC and DC charging for homes, estates, workplaces and fleet depots, planned against the site load and the generation or storage available behind it.
Spare packs, controllers, charging hardware and service parts supplied alongside the fleet, with diagnostic capability and technician support considered before deployment.
02
Charging is a site load. We plan it alongside the building, depot or estate infrastructure so the charging requirement does not become an afterthought after the vehicles arrive.
Where solar generation and storage are in scope, charging infrastructure is coordinated with the same site design rather than treated as a separate procurement.
03
In Lagos we executed a client procurement mandate for 50 electric vehicles, sourced in China, cleared through customs, and deployed into service with private estate security operations. A complete sourcing-to-deployment cycle, delivered for an estate operator.